Βασικές πληροφορίες
Gas: Acetylene
Factory Location: Dongtai, Jiangsu
Company Type: SGS Audited Manufacturer
Work-Piece Type: Ss, Carbon Steel, Alloy Steel Plate
Cutting Method: Thermal Cutting, Hot Cutting
Cutting Accuracy: 0.5mm/M
Drive System: Famours Brand Servo Motor and Planet Reducer
CNC Control System: According to Customer Request
Specification: ISO
περιγραφή προϊόντος
CNC μηχανή κοπής με φλόγα και πλάσμα can be applied in lot size straight steel plate cutting, as well as various geometric shape steel. The main frame is bent, welded and annealed to remove the stress, so it is stable and not easy to become deformed. The servo motor, reducer, pressure release valve, air pipe and magnetic valve as well as cutting gun used are all world famous brand, thus to ensure stable quality.
Προσδιορισμός
The cutting machine uses imported AC motor, and driven with imported bevel gear reducer. With precision gear and rack move, to ensure stable function. Air cutting speed is adjusted by frequency transformer. The air source control box on the main engine can adjust air pressure from every tunnel easily. All the pressure adjusting valve and main air pipe are original imported. Pipe and wire on the broadwise cutting gun all use imported supporting chain, safe and neat.
1. The CNC flame cutting machine is guide rail fixed, gantry gate move type;
2. The flame cutting guns will cut the flange and web of H beam;
3. Cross arm operation accuracy is within 0.5mm/m;
4. Oxy and acetylene or oxy and acetonum gas as fuel source;
5. Guide rail length is 14M*2PCS;
6. X axis Panasonic servo and pilot reducer driven, Y axis Panasonic servo and pilot reducer driven;
7. CNC system: Beijing SH-2000.
Supply scope
2. Track unit: Guide and accessories. The guide size is 14m*2PCS.
3. Cutting gun unit: Linear single cutting gun*10PCS and accessories.
4. Electric control system: Electric control cabinet, longitude and broadwise motors and accessories.
5. Gas source unit: Main air rubber pipe, suspending sliding vehicle and etc.
6. Spare parts: 1 set
Documents with goods
2, Certificate
3, Packing list
4, On site installation drawing for laying foundations.
Equipment quality and after-service commitment
2. Our products should meet all the technical requirement and parameters, and ensure the safe and stable function.
3. We will send workers to the working site of the buyer for engaging in and instructing the installation and test, until the equipment is ready for use. We also train the equipment operator and maintenance staff for user.
4. The equipment guarantee period is one year. During this period, for the breakdown not caused by mis-operation by user, we will be responsible for repair and replace.
5. After the guarantee period, our companies will provide maintenance service and spare parts at low cost.